Skip to content
Sarkari Map
Back to search
Building and constructionConfidence: Medium

Building permit

Get approval for a new building or major structural change from your local government.

Fees

Fee depends on building size, use, and local government rules.

Processing time

Usually a few weeks after a complete application and drawings are submitted.

Documents needed

  • Land ownership certificateRequired
  • Cadastral map and plot detailsRequired
  • Architectural and structural drawingsRequired
  • Application formRequired
  • Engineer's certificate, if requiredOptional

Forms and online application

Step by step

  1. 1

    Prepare the drawings

    Get architectural and structural drawings prepared by a registered professional.

  2. 2

    Submit at the local government

    Submit the application, land documents, and drawings at the building permit section.

  3. 3

    Pay the fee and collect the permit

    After technical review, pay the prescribed fee and collect the building permit.