Back to search
Building and constructionConfidence: Medium
Building permit
Get approval for a new building or major structural change from your local government.
Fees
Fee depends on building size, use, and local government rules.
Processing time
Usually a few weeks after a complete application and drawings are submitted.
Documents needed
- Land ownership certificateRequired
- Cadastral map and plot detailsRequired
- Architectural and structural drawingsRequired
- Application formRequired
- Engineer's certificate, if requiredOptional
Forms and online application
Step by step
- 1
Prepare the drawings
Get architectural and structural drawings prepared by a registered professional.
- 2
Submit at the local government
Submit the application, land documents, and drawings at the building permit section.
- 3
Pay the fee and collect the permit
After technical review, pay the prescribed fee and collect the building permit.